Active ingredients | Acetamiprid |
CAS Number | 135410-20-7 |
Molecular Formula | C10H11ClN4 |
Classification | Insecticide |
Brand Name | POMAIS |
Shelf life | 2 Years |
Purity | 20% SP |
State | Powder |
Label | Customized |
Formulations | 20%SP; 20%WP |
The mixed formulation product | 1.Acetamiprid 15%+Flonicamid 20% WDG
2.Acetamiprid 3.5% +Lambda-cyhalothrin 1.5% ME 3.Acetamiprid 1.5%+Abamectin 0.3% ME 4.Acetamiprid 20%+Lambda-cyhalothrin 5% EC 5.Acetamiprid 22.7%+Bifenthrin 27.3% WP |
Acetamiprid is a pyridine insecticide of nicotine chloride, which has strong contact and penetration effects, good quick effect and long residual effect period. It acts on the posterior membrane of the insect nerve junction, and makes the insect extremely excited, convulsing and paralyzing to death by binding with acetyl receptor. It can effectively control cucumber aphids.
Suitable crops:
Formulations |
Crop names |
Fungal diseases |
Dosage |
Usage method |
5%ME |
Cabbage |
Aphid |
2000-4000ml/ha |
spray |
Cucumber |
Aphid |
1800-3000ml/ha |
spray |
|
Cotton |
Aphid |
2000-3000ml/ha |
spray |
|
70%WDG |
Cucumber |
Aphid |
200-250 g/ha |
spray |
Cotton |
Aphid |
104.7-142 g/ha |
spray |
|
20%SL |
Cotton |
Aphid |
800-1000/ha |
spray |
Tea tree |
Tea green leafhopper |
500~750ml/ha |
spray |
|
Cucumber |
Aphid |
600-800g/ha |
spray |
|
5%EC |
Cotton |
Aphid |
3000-4000ml/ha |
spray |
Radish |
Article yellow jump armour |
6000-12000ml/ha |
spray |
|
Celery |
Aphid |
2400-3600ml/ha |
spray |
|
70%WP |
Cucumber |
Aphid |
200-300g/ha |
spray |
Wheat |
Aphid |
270-330 g/ha |
spray |
Are you a factory?
We could supply insecticides, fungicides, herbicides, plant growth regulators etc. Not only we have our own manufacture factory ,but also have long-term cooperated factories.
Could you provide some free sample?
Most samples of less than 100g can be provided for free, but will add extra cost and shipping cost by courier.
From OEM to ODM, our design team will let your products stand out in your local market.
Strictly control the production progress and ensure the delivery time.
Within 3 days to confirm the package details,15 days to produce package materials and purchase products raw material,5 days to finish packaging, one day showing pictures to clients, 3-5days delivery from factory to shipping ports.
Optimal shipping routes selection to ensure delivery time and save your shipping cost.